An unsuspecting cabin and cockpit.
All it needs is a little jig saw/ sawsall work.
I open up the cabin roof so I can move about easier.
Then comes the cockpit.
The remains.
After 3.5 hrs with the sawsall, I had the entire structure out and cross beams in place in case she springs in.
Another view.
5 coats of varnish. 3 Allspar, 2 Epiphanes. One more coat needed.
General deck arraignment, courtesy of Hart Nautical Collections at the MIT museum.
Detailed construction drawings.